“In six months, the public cost had gone from minimal to £60m, with limited transparency, on the basis of wavering cost estimates. These facts were not made available at the time of the public consultation on the project in November 2013.”
source ArtsJournal http://ift.tt/1m5QGsI


07:39
mohammed mechmachi
Posted in:
0 commentaires:
Enregistrer un commentaire