“In six months, the public cost had gone from minimal to £60m, with limited transparency, on the basis of wavering cost estimates. These facts were not made available at the time of the public consultation on the project in November 2013.”
source ArtsJournal http://ift.tt/1m5QGsI
0 commentaires:
Enregistrer un commentaire